Millipore Milli-Q Plus User Manual Page 24

  • Download
  • Add to my manuals
  • Print
  • Page
    / 90
  • Table of contents
  • BOOKMARKS
  • Rated. / 5. Based on customer reviews
Page view 23
- 24 -
Installing the Q-Gard Pack
Procedure
Follow the steps below to install a new Q-Gard Pack.
Step Action Diagram
1 Start in STANDBY Mode.
NOTE:
The Q-GARD PACK OUT
Alarm message is not shown at
this time. By following the
instructions earlier in this
manual, the alarm was
cancelled.
2 Open the left door of the
System Cabinet.
Remove the 2 protective caps
located on the ports inside.
3 Remove the covers on the 2
ports of the Q-Gard Pack.
Make sure the rubber O-rings
are firmly in place.
Wet the O-rings with water.
4 Push the top of the Q-Gard
Pack into the ports on the
System.
Continued on next page
Page view 23
1 2 ... 19 20 21 22 23 24 25 26 27 28 29 ... 89 90

Comments to this Manuals

No comments